The New Peschiera Aqueduct: the project
Almost ninety years after work began on the Peschiera Aqueduct, the project to build its new upper section is taking shape. It is Europe's largest water infrastructure project: a strategic investment to ensure water supply continuity and security for Rome and Central Italy.
Inaugurated on 4 November 1949, the Peschiera Aqueduct is the main water supply system serving the metropolitan area of Rome.
The aqueduct extends for 130 km from the spring area located in the municipality of Castel Sant’Angelo, in the province of Rieti, serving 151 municipalities along its route. With a flow rate of approximately 14 m³/s (including the contribution of the Le Capore springs), it supplies a total of around 4 million people.
The New Peschiera Aqueduct: the project
To ensure Rome’s water security, the New Peschiera Aqueduct project has been launched. The project includes the construction of the New Upper Section, which extends from the Peschiera springs to the Salisano plant and optimises conveyance capacity up to 10 m³/s (corresponding to the concession flow rate).
The new line of the Peschiera Aqueduct is designed to ensure service continuity and the highest level of protection for the water resource, safeguarding it for future generations.
total investment
of Rome's water supply
people served
Click on the numbered dots to find out more
about the route of the New Upper Section of the Peschiera Aqueduct.
Intake Works
Microtunneling
Diameter: 2,500 mm
Length: 2,900 metri
Ponzano Tunnel
Free-surface hydraulic tunnel
Diameter: 4,000 mm
Length: 4,700 m
The Ponzano Tunnel is built using Tunnel Boring Machine (TBM) technology.
Cognolo Tunnel
Free-surface hydraulic tunnel
Diameter: 4,000 mm
Length: 2,860 m
The Cognolo Tunnel is built using Tunnel Boring Machine (TBM) technology.
Zoccani Tunnel
Free-surface hydraulic tunnel
Diameter: 4,000 mm
Length: 2,080 m
The Zoccani Tunnel is built using Tunnel Boring Machine (TBM) technology.
Montevecchio Tunnel
Vehicle-access tunnel with pressurised pipeline
Diameter: 7,500 mm
Length: 13,380 m
Internal Pipeline Diameter: 3,400 mm
The Montevecchio Tunnel is built using Rock Tunnel Boring Machine (Rock-TBM) technology.
Learn how we are building the future of water.
Acea Infrastructure coordinates the entire design process, from feasibility to the final design. Thanks to the use of cutting-edge technologies, it ensures technical precision and sustainability along the 27 km route.